|
09.15.1970 The factory was established
.
12. 1972 The small-scale aluminium electrolytic
condenser of factory was trial-produced successfully
and produced in batches .
03.1980 Premier of the State Council comrade Li
Peng inspected the factory .
07.5.1982 The factory introduced the electrolytic
condenser production technology of aluminium and
key equipment from Japan .
12. 1984 The factory introduced the second issue
technological project to transform , the large-scale
aluminium electrolytic condenser formed the batch
.
2.20.1985 National the Ministry of the Electronics
Industry vice-minister Liu Jian feng cut the ribbon
for the project of the factory 1, And confirm through
being national-level.
06.23.1986 Chairperson comrade Qiao Shi of standing
committee of National People's Congress inspected
the factory .
08.29.1986 China's quality system authentication
committees sent the certificate of competency of
quality authentication of the electronic devices
and components frequently for the factory .
09.10.1986 The State Council's electronic products
were exported the office and approved the factory
for exporting for the electronic product to the
base enterprise.
12.1986 Electrolytic condensers at national Economic
and Trade Commissions, national qualities authorize
card of Nantong CD No. 11 committee approve and
win the gold medal .
01.1988 At France in introducing high pressure corroded
and be able to composed production equipment and
technology factory the third a issue of technological
transformation projects .
6.19.1988 With the approval of the State Council's
business administration steering committee, the
factory was determined as the national secondary
enterprises .
11.1988 The TongYi electronics corporation, Ltd.s
of pool capital south of Hong Kong were established
.
03.20.1991 The factory made the national first class
measurement unit certificate .
11. 1992 The factory strode into the ranks of Chinese
500 and 50 trades, The honour occupies 50 the bests
of manufacture of electron and communication The
27th place of industrial enterprise of economic
benefits.
07.1993 Approved by national State Economic and
Trade Ministry , the factory obtained the exit to
weigh on one's own account, got the pass entering
the international market directly.
10. 1993 Stick the electrolytic condenser production
line of a slice of aluminium to go into operation
miniaturly in the fourth issue and first of the
whole country introduced from Japan of technological
improvement project of the factory .
02.1994 The special-purpose aluminium electrolytic
condenser production line of the flash threw the
line.
05.3.1994 The limited formula of the Sun electronics
industry of Nantong of Sino-Japanese joint-venture
was open formally .
08.29.1995 The factory was asserted for the new
high-tech enterprise of Jiangsu .
12.1995 " pair was added" projects were
examined and approve through national Economic and
Trade Commission in the factory . The subsidiary
factory of Yongxing of Nantong is established.
08.1996 The sixth issue technological improvement
project of the factory was introduced and substantiated
the large-scale aluminium electrolytic condenser
production line to go into operation.
09.23.1999 Factories were determined as a grade
of technique center of enterprise of Nantong.
04.10.2000 Establish NanTong TongFei high science
& technology co., ltd.
04.10.2000 Factory and electronic pearl know society
establish all in put through to hold electronics
corporation, Ltd. of south of a hill signing ceremony
south by joint-venture by type ¡µ¡ó Japan will it
be April 25 2000, Expand production and weld a needle
of aluminiums electrolytic condenser of spiral type. |
|